Fyi I did relay the message. Cool on the signup. New additions coming to site soon. Adding a booking section and will be a gallery page with some of the ladies in it. Trying to get the photo shoot done within the next week. All the girls will be wearing our branded attire along with some video.
The builder says construction is ahead of schedule and will be complete mid Sept with a early handover. Need rest of month to design/choose/deliver all the new furnishings. Everything will be new.
Layout will be two suites.
One suite with master bedroom, ensuite bathroom with walk in shower and Jacuzzi tub, patio and a rather large loft area which we haven't decided what to do with yet. Maybe a theme room.
Second suite with master bedroom, ensuite bathroom with walk in shower, second lounge room almost as big as master.
Ground floor will be a common area with kitchen, living room etc.
As soon as turnover is complete and furnished we will get interior pictures out along with the ladies present at the location. This is identical property to the pictures posted on our site with slight colour changes to exterior.
Hoping for October 18th availability at latest.